Permit Types | City of Tempe, AZ If you have any questions about the the type of permit required for your project, please call (480) 350-8341, Option 1. Check the zoning ordinance for the minimum side or rear yard setbacks (the horizontal distance between a building, structure or wall from the property line), for the distance an awning can project into the required setbacks, Prefabricated above-ground swimming pools with a capacity of less than 5000 gallons of water, Painting, floor covering or interior trim work, Roofing repair or replacement with the same materials unless roof sheathing (the plywood under the shingles) is replaced, A portable heating appliance, portable ventilating equipment, portable cooling equipment or portable evaporative cooler. The individual doing the work authorized by the permit must call for an inspection prior to covering or concealing the work. Kris Mayes, newly elected state attorney general, arrives for the formal inaugural ceremonies Jan. 5, 2023, outside the state Capitol. Kathy Ferris, a water attorney and former director of ADWR, emphasized that Arizonas groundwater problems are bigger than one company. The document also contains a template for a required written radiation safety program. Review and share content with staff. Read Proposition 65 FAQ. This week, spokespersons for both officials declined to directly contradict the others version of events, but both offices implied that theyd been behind the move. One acre-foot is enough water for about three Phoenix-area households for one year, according to ADWR. Do I Always Need A Permit? A Project Submittal Form and two (2) complete sets of plans are required for Commercial and Industrial submittals. The Community Development Department, Permit Counter, located at 31 E. 5th St. in the east side garden level of the Tempe City Hall complex, has additional brochures and handouts on topics of frequent interest such as plan check, building inspections, variances, etc. When Do I Need A Permit? (Res. Develop and implement anExposure Control Planif employees are hired. Mayes criticized the deal during her campaign, and in a February TV interview said she was planning to take action, indicating that her office would announce concrete action soon. 480 350-4311 Two (2) sets of Structural Calculations (if applicable) This category only includes cookies that ensures basic functionalities and security features of the website. Train employees on the contents of the plan. Two (2) extra site plans for engineering review (showing onsite lot retention) However, it's unknown if doing so will have any impact on the alfalfa-growing business of the company, Fondomonte . Two (2) extra site plans for Engineering review (showing onsite lot retention). In 2019 and 2021, the company sought and received approval to drill two separate wells to a depth of 1,510 feet. When applicable, separate permits for mechanical, plumbing and electrical work are required. Share & Bookmark, Press Enter to show all options, press Tab go to next option, Responsibilities After Obtaining A Permit, Community Development Project Assistance Team, Building Inspection Zones Map & Information, Check Inspection Status and Schedule Inspections, City Hall, 31 E. 5th St., Tempe, AZ 85281, One story detached accessory buildings used as tool or storage sheds, playhouses or similar, Retaining walls not over 4 feet high, when measured from the bottom of the footing to the top of the wall or retaining less than 3 feet of earth, Platforms, walks and driveways less than 30 inches above grade and not over any basement or story below Window awnings supported on an exterior wall and not projecting more than 54 inches.